感谢您关注!您离开之前... 关注中项网服务号免费订阅项目... 注册免费体验中项网服务
服务热线: 4008161360
项目
  • 项目
  • 招标
  • 重点项目
  • 设计院库
  • 项目汇总
  • 统计分析
  • 展会信息
搜索




【全国】沙特吉赞片区F7006项目新营区板房材料042采购公告
发布时间 2024-10-05 截止日期 立即查看
联系人 立即查看 联系电话 立即查看
项目地址 立即查看 采购业主 立即查看
采购项目编号 立即查看 采购人 立即查看
预计采购时间 立即查看 预算金额 立即查看

下文中****为隐藏内容,仅对中项网会员用户开放, 【 注册 / 登录 】 后可查看内容详情

采购公告详情

1. The unit price of the above goods is fixed during the supply period and will not be adjusted. 2. The price of this Purchase Order includes all expenses incurred by the supplier in performance of this Purchase Order, which include but no limited to production, packaging, storage, transportation, taxes, risks, etc. 3. The quantity of goods in this Purchase Order is provisional, and the CHEAC has the right to adjust it according to CHEAC’s requirements; the measurement shall be based on the quantity actually supplied by the supplier and accepted by the CHEAC. Supplier shall not make any claim to CHEAC for the adjustment of quantity. CHEAC has the right to increase the obligation of Supplier, which request Supplier supply more quantity at the same price beyond the Purchase Order, but it shall not exceed 15% of the Purchase Order value. 4. The Supplier has carefully read the bidding documents/inquiry documents provided by CHEAC, fully understands and agrees to supply goods in accordance with the specifications required by the documents. In addition, the material test certificate (MTA) shall be approved by CHEAC and Employer. 5. The Supplier shall provide documents or certificates for goods, including but not limited to delivery notes, product factory certificates, inspection reports, product certificates or manufacturers" relevant certificates. CHEAC will not be responsible for any additional costs or infringements and disputes arising from the documents and certificates. 6. If the goods are rejected by CHEAC due to low quality or non compliance on CHEAC’s requirement, the Supplier shall replace it with qualified and acceptable ones at his own cost within 3 days, and CHEAC reserve the right to claim for the lost cause by it. 7. The Supplier shall take measures to prevent goods from damage until the goods are received by CHEAC. Once the goods is damaged before the receipt, CHEAC has the right to deduct payment or request Supplier to replace it. 8. CHEAC has the right to terminate this purchase order, once : 1)The Supplier fails to comply with CHEAC"s reasonable instructions and HSE requirements; or 2)The Supplier are unable to deliver goods on time; or 3)The Supplier fails to replace goods rejected by CHEAC on time; or 4)There are clear signs that the Supplier is unable or unwilling to perform this Purchase Order; or 5)CHEAC makes decision to terminate it based on its consideration. 9. Once CHEAC terminates this Purchase Order in accordance with the above terms, the two parties shall measure and settle the quantity of materials already delivered. The Supplier shall not be entitled to claim for any cost other than the materials delivered. 附件列表 序号 附件名称 附件说明 操作 1 JZFJ-LXCG-2024-042板房材料询价***x 下载 预览 验证码 验证码 取消确定 物资信息 序号 设备物资名称 设备物资说明 数量 单位 1 彩钢瓦 0.5mm 彩钢瓦6*1.5m, 0.3mm thk 500 张 2 麻袋 吨袋1ton 10 个 3 排水用(PVC-U)90°弯头 dn200mm 胶粘剂连接 UPVC弯头DN50,90° 200 个 4 电缆盒基础角铁 镀锌角铁50mm*50mm*5mm*6m 30 个 5 立面标记 反光油漆 镀锌喷漆400ml/bottle 60 瓶 6 撑架螺栓 镀锌螺栓M8*20MM, make nut 配螺母 150 个 验证码 验证码 取消确定 相关公告列表 序号 类型 标题 环节 发布时间 暂无数据 验证码 验证码 取消确定

会员特色服务

  • 寻找项目
  • 信息定制
  • 项目跟进
  • 业主库
  • 设计单位
  • 收藏信息

项目日历

更多...

地区导航

下载APP

扫码下载中项网APP

关注微信

扫码关注中项网服务号