感谢您关注!您离开之前... 关注中项网服务号免费订阅项目... 注册免费体验中项网服务
服务热线: 4008161360
项目
  • 项目
  • 招标
  • 设计院库
  • 展会信息
搜索




CHEC-SEDRA345-PD-CC-2025-002INQUIRYFORTHECUSTOMSCLEARANCEANDLANDTRANSPORTATIONSERVICE

发布时间 2025-03-23 截止日期 立即查看
联系人 立即查看 联系电话 立即查看
项目地址 立即查看 招标机构/单位/公司 立即查看
填报单位 立即查看 代理机构联系人 立即查看
设备词 立即查看 招标编号 立即查看

下文中****为隐藏内容,仅对中项网会员用户开放, 【 注册 / 登录 】 后可查看内容详情

招标公告详情

点击注册登录

Bidders:

 

This is CHEC KSA Sedra Phase 3,4 & 5 Project, and now we are looking for suppliers to provide the customs clearance and land transportation service.

1. Scope of service:

Ø All related service regarding to the Customs clearance;

Ø Ship information notice;Support for claim if happened;

Ø Land Transportation to Project site in Riyadh

Ø Customs Cards Application for required equipment, such as Mobile Crane, Rough Terrain Crane, Tractor Truck, Semi-Trailor, Roller, Grader.

Ø Vehicle Registration Service(optional), if Buyer required.

2. Goods from:SHANGHAI & QINGDAO, CHINA

3. Port of destinationDAMMAM PORTKSA

4. Final destination:Sedra area, Riyadh 

5. Transportation responsibility duration: from the arrival of the goods at Dammam Port until customs clearance is completed, custom cards ready, Vehicle Registration ready, and delivery is made to the project site.

6. Quotation validity period: no earlier than 90 days after the quotation deadline.

7. Goods List:See attachments  Goods List.

8. Saler shall fully consideration of the safety, convenience of the Goods delivery and loading/offloading.

9. Shipper of the Goods:CHINA HARBOUR ENGINEERING COMPANY LTD. Consignee:BRANCH OF CHINA HARBOUR ENGINEERING CO., LTD 

10. Payment terms: 

After the goods are delivered to the designated location of the project and the custom cards ready, the bidder will send the cost confirmation form to the inquirer, and the inquirer shall confirm or raise an objection within 10 working days after receiving the cost confirmation form. After both parties confirm the cost, the bidder will issue the corresponding invoice to the inquirer, and the inquirer shall pay the full amount within 10 working days after receiving the invoice, custom cards (for required equipment), and necessary financial documents, such as the invoices of the actual payee fee by port, delivery notes of the trucks, etc.

The payment of any amount by the inquirer to the bidder is merely the fulfillment of the payment obligation by the inquirer and does not mean that the bidder is relieved of any obligation or liability under this contract, nor does it mean that the tenderer has waived its subsequent rights to the goods under the related payment items, nor does it mean that the bidder will no longer bear subsequent liability.

11. Inquiry by: BRANCH OF CHINA HARBOUR ENGINEERING CO., LTD

12. Currency: SAR

13. Bidding schedule:CHEC issue the Inquiry Document based on Public Inquiry process for all the suppliers which in CCCC Supply Chain System on 23 March 2025(http***/)。

Deadline of the submittal: 26 March 2025, 5pm,(KSA time),quota and submit required documents in the System online(Attachment 1, Attachment 2.1&2.2 ,Attachment 3)。

Attachment 1Quotation Letter

Attachment 2:Quotation Form

Attachment 3:Deviation Table

Attachment: Purchase Order form and attachment

AttachmentGoods List-Bulk

 

BRANCH OF CHINA HARBOUR ENGINEERING CO., LTD

Sedra Phase 3,4,5 and Warefa Units Project

2025 March 23

附件列表
序号
附件名称
附件说明
操作
物资信息
序号
设备物资名称
设备物资说明
数量
单位
1
公路货物运输服务
1
相关公告列表
序号
公告类型
公告名称
环节
发布时间
暂无数据

下载APP

扫码下载中项网APP

关注微信

扫码关注中项网服务号